Concrete jacking pipes are used for the construction of sewers and pipelines, without disturbing the road system and the environment. This technique in fact allows to push the pipe directly without digging under a road, under a watercourse, under the tracks of a railway, even under a water table, with a controlled pushing system.
Our concrete pipes are designed and built with the most advanced materials, machinery and production processes. Thanks to the partnerships developed by COPREM with the leaders in the sector, they are able to withstand all the pushing forces required for the microtunnelling technique with the characteristics of the soil and these design parameters:
The version with our patented Welded Joint® uses a high density polyethylene (HDPE) liner that protects the inside of the pipe at the joint. The qualified personnel of Coprem Service carry out the welding of the joints with the extrusion method according to EN 13067, completing the protection and the hydraulic seal of the pipe. It also makes possible: