Works are planned for the entire region to complete the Calabria's natural gas network following the signing of contracts by distribution companies to connect to the Snam pipeline network. These works, which provide for the construction of methane pipelines for a total of approximately 310 km, include 17 adductors (14 of which have already been built) serving 62 redelivery points (49 of which have already been built).
The worksites involved in this intervention are related to the derivation of the methane pipeline for the municipalities of Montello Jonico and Melito Porto Salvo.
jacking pipe during the preparation of the shipment: just one of the 1300 works
some pictures from the jacking station
internal view of the pipeline